61,000 futures at the start of the scholastic year
The immense responsibility on the shoulders of our educators is truly incredible especially when one considers the amount of responsibility there is on the curriculum front as well
In the past week, over 61,000 students started their scholastic year. It’s not the highest number for a country, but when one thinks about it you also feel a daunting responsibility towards each and every one of them. In education, we are often judged by the collective. How many have passed, how many have continued post-sec and tertiary and so on.
But each and every educator we have in schools works tirelessly every day to provide a future to each and every one of those 61,000 young people. In 20, 30 years’ time that group of people will be the engine and energy of our country. The values they see today represented in their teachers and the adults in their lives will be the values of the Maltese society then. It’s a collective result, but an individual challenge for all.
These things are often missed by the population at large, but the immense responsibility on the shoulders of our educators is truly incredible especially when one considers the amount of responsibility there is on the curriculum front as well.
That is why I think we should appreciate more our teachers as a society and the enormous commitment they have towards our children, and our society.
Capital investment in schools
Some of our primary schools were built over a hundred years ago and they are often in the core area of the town or village. Over the past years a lot of investment has poured into school infrastructure. Since 2013 we have diversified our financial resources, funded by taxpayers, to a wide net of schools. The reasoning was very simple: in a college of ten schools you can’t have one or two grand ballroom-type schools and eight others in disrepair. Tens of millions have been invested in the infrastructure of schools, and in most cases, it also required expansion within the building.
The challenge in most primary schools are two-fold. First you have the issue of availability. You can’t exactly refurbish the school during the scholastic year. Anyone who is building anything knows that the availability of supply in the construction industry and limiting yourself to just three months creates a lot of issues. The second is the building themselves, as they’re old and were probably not build originally to accommodate a school.
We have created a number of workarounds, such as temporary classrooms. This allows the division between the building and students, allowing construction to take place in a safe environment. All prefabricated classrooms are temporary until works are concluded, however we still invested heavily to make sure no student has one less resource than they would have gotten in their previous classroom. In most cases there are some perks that one wouldn’t find in other classes, such as air-conditioning, which is present in all pre-fabricated classes.
Have we refurbished everywhere? Absolutely not. There’s still a lot to come and I, for one, understand parental concern when photos are published of below-par infrastructure.
The reality is that primary schools built ages ago require a lot of work and, in terms of sustainability, it would make more sense to have new ones. In some cases this process has already started.
-
National
Drowning victim Nadab John became altar boy just weeks before his death
-
National
Gżira United's 1976 claim on Manoel Island does not hold up, says former mayor
-
National
Borg says confirmation vote is a mandate to renew PN and get closer to people
More in News-
Online Casinos
Casino En Ligne France Retrait Rapide : Méthodes 2026
-
Online Casinos
Casino Online Sin DNI — Guía Completa para Jugadores en España
-
Online Casinos
Külföldi Online Kaszinó – Útmutató Magyar Játékosoknak 2026
More in Business-
World Cup 2026
Argentina knockout England to reach back-to-back World Cup finals
-
Motorsports
Jacob Micallef fights back to top ten at Red Bull Ring in Austria after tough qualifying
-
Motorsports
Matthias Sultana impresses in Spanish tests as Team Pileri Terni looks ahead to the Mir Moto5 Trophy
More in Sports-
Theatre & Dance
Malta-first production of Jean Genet’s The Maids to open at Theatre Next Door
-
Music
No cars allowed near Pitbull concert venue as organisers launch €15 shuttle service
-
Cultural Diary
My essentials: Pietru Farrugia’s cultural picks
More in Arts-
Editorial
The gulf between the project and the dream
-
Opinions
Appearance should never be a reason to be treated unfairly or differently
-
Law Report
No need for a precise price but need of a fair price in co-ownership action
More in Comment-
Articles
The mattress that could change how we sleep
-
Magazines
Architecture & Design June edition available to read online
-
Magazines
Archticeture & Design April edition available to read online
More in Magazines