When a latent defect claim is time-barred
In his application Vella Laurenti had purchased a property in Xaghra, Gozo on 20 December 1994, but in November 2010 a number of defects started appearing, which did not appear on signing of the contract.
The Magistrates’ Court in Gozo held that a latent defect claim following a purchase of a property in 1994 is time-barred and therefore, had to be turned down. This was decided by Magistrate Dr Joanne Vella Cushieri in John Vella Laurenti –v– Michael Refalo and Marie Louise Refalo.
In his application Vella Laurenti had purchased a property in Xaghra, Gozo on 20 December 1994, but in November 2010 a number of defects started appearing, which did not appear on signing of the contract. He asked the court to decide that property was effected by latent defects and asked for the court to order a refund of part of the purchase price.
The Refalos held in their statement of defence that what the plaintiff is alleging does not amount to latent defect at law and even if there were defects these were not latent. The defendants claimed that the action is time barred according to Article 1407 of the Civil Code.
Magistrate Vella Cuschieri examined the evidence produced. The plaintiff purchased the property on 20 December 1994 in shell form. He testified that before purchasing the property there was always crushed stones. The defendants disagreed and held that the property was handed over clean. The plaintiff claimed that at the end of 2010, some defects appeared and were listed by his architect Herbert Debono. According to the architect water seeped down to the apartment below that of the plaintiff. The architect ordered to have the tiles removed and discovered that there was a crack. He then filed a judicial letter asking the defendants to liquidate damages. In order to remedy the situation, the plaintiff spent €1634.60.
The defendants held that at the time when Vella Laurenti purchased the apartment, there were no stones on the ground and therefore, he crack should have been visible. Furthermore, the Refalos argued that these cracks were in fact necessary.
As regard to the plea of prescription, the court first analysed the submissions of the defendants, who pointed out that before 2010, the plaintiff had grouted the floor tiles of the veranda, but received complaints from the underlying property owners that water was seeping in. This took place for a number of years.
Therefore, the defect existed for a number of years. The court case was filed on 3 November 2011, four years after September 2007 when Vella Laurenti knew of that there was a problem. According to Article 1431(2) of the Civil Code, the prescriptive period commences when the latent defect is known.
The Court commented that although it could have been probable that Vella Laurenti was unaware of the defects on the date of purchase, he was informed by the previous owner that there was a problem of water seepage. In these circumstances, he could have engaged an architect to make the verifications necessary before signing the contract. Since four years passed from when the defect could have been discovered, the action was time barred.
Magistrate Vella Cuschieri, then entered into the merits of the action in terms of Article 1427 of the Civil Code, where the plaintiff is requesting to keep the apartment but to be refunded part of the price. The plaintiff argued that the refund of the price should match the damages sustained. The Court disagreed. In a previous judgement Carmelo Muscat –v- Martin Imbroll of 1 February 1995, the part of the price which should be refunded should match the difference in value of the property with and without the defect.
The Court then moved to turn down the claim and declaring the action time barred.
-
National
Fearne, Cutajar return to Cabinet an ‘abandonment’ of accountability, Repubblika says
-
National
Who’s who in the new Cabinet
-
National
Over 50 pigeons found dead in loft during animal cruelty inspection
More in News-
Business News
Navigating the new era of FinTech: MFSA launches high-level masterclasses on AI, crypto, and MiCA compliance
-
Business News
Alkagesta participates in IATA Aviation Energy Forum amid SAF market transition
-
Business News
Economic sentiment moderates towards long-term average in April
More in Business-
Sportsbetting
What new Irish betting regulation could mean for Maltese bookmakers
-
Sportsbetting
Neptunes crowned BOV U18 champions after decisive win over Sliema
-
Football
Futsal Malta 2025/26: Young challengers face Luxol in Laferla Men’s Trophy final
More in Sports-
Books
The 2026 Doreen Micallef National Poetry Contest is now open for entries
-
Books
New Queen Elizabeth II biography launched at the Phoenicia Malta
-
Art
Malta Biennale 2026 comes to a close
More in Arts-
Opinions
We choose to build Momentum. Not because it is easy, but because it is hard
-
Editorial
Labour must now show it is deserving of the electorate’s renewed trust
-
Opinions
Robert Abela can make some courageous reforms, he has nothing to lose
More in Comment-
Articles
Richard England launches new book Katabasis: A Stygian Odyssey
-
Recipes
Steak, onion and mushroom pie
-
Recipes
Lemon and herb swordfish with tomatoes and mushrooms
More in Magazines